The building’s footprint occupies the entire site. It’s a striking building that meets all imposed conditions by means of smart transformations on the shape and internal organization regarding the integration in the area, the program for housing and parking, spatial quality, social living qualities and architecture. The rather simple outside of the building is completed with an exciting inner world where the common outside space and the entrances to the houses are located. The materials emphasize the difference between inside and outside.
Status: 1st prize competition 2012, start construction 2016, Completed in 2018.
Team: J. De Wachter, E. Jakovele, A. Kalinauskas, E. Kang, G. Castanheira
Opdrachtgever: SHM De Ark
Locatie: Oud-Turnhout, BE
Programma: 18 social houses
The building’s footprint occupies the entire site. It’s a striking building that meets all imposed conditions by means of smart transformations on the shape and internal organization regarding the integration in the area, the program for housing and parking, spatial quality, social living qualities and architecture. The rather simple outside of the building is completed with an exciting inner world where the common outside space and the entrances to the houses are located. The materials emphasize the difference between inside and outside.
Status: 1st prize competition 2012, start construction 2016, Completed in 2018.
Team: J. De Wachter, E. Jakovele, A. Kalinauskas, E. Kang, G. Castanheira
Opdrachtgever: SHM De Ark
Locatie: Oud-Turnhout, BE
Programma: 18 social houses
The building’s footprint occupies the entire site. It’s a striking building that meets all imposed conditions by means of smart transformations on the shape and internal organization regarding the integration in the area, the program for housing and parking, spatial quality, social living qualities and architecture. The rather simple outside of the building is completed with an exciting inner world where the common outside space and the entrances to the houses are located. The materials emphasize the difference between inside and outside.
Status: 1st prize competition 2012, start construction 2016, Completed in 2018.
Team: J. De Wachter, E. Jakovele, A. Kalinauskas, E. Kang, G. Castanheira
Opdrachtgever: SHM De Ark
Locatie: Oud-Turnhout, BE
Programma: 18 social houses